LUPESCAPE Forum Index
RegisterSearchFAQMemberlistUsergroupsLog in



bridge was completed

 
Reply to topic    LUPESCAPE Forum Index » Jokes View previous topic
View next topic
bridge was completed
Author Message
kimerajamm



Joined: 28 Nov 2010
Posts: 416

Post bridge was completed Reply with quote
When it became clear that the bridge could not be repaired, PennDOT awarded an emergency contract for a temporary bridge before the end of January, citing "emergency vehicles that can no longer travel directly from Barbours" to Proctor and beyond.[19] The temporary bridge cost $87,000 and was 24 feet (7.3 m) wide.[19] The photographs for the bridge's inclusion in the Historic American Engineering Record (HAER) were taken in January, and the HAER "documentation package was prepared as mitigation for the emergency demolition" of the bridge, which was collapsed in March.[2] The permanent replacement bridge was completed in 1996,[15] and the bridge was removed from the NRHP on July 22, 2002.[21]


Air Conditioner Compressor
north carolina lawyers directory
Thu Apr 21, 2011 4:05 pm View user's profile Send private message
Free Forum






Post ForumsLand.com

 
Display posts from previous:    
Reply to topic    LUPESCAPE Forum Index » Jokes All times are GMT
Page 1 of 1

 
Jump to: 
You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot vote in polls in this forum